Friday, August 22, 2008


April 15th, 2008...Mailed my quarterly & annual contribution to Uncle Sam and put up the first wall! Thankfully Jason came home for lunch and added his muscle to the house raising.


April 14th, 2008...Foundation passes inspection and the lumber is delivered! Yahoo! Let the framing begin!!!!!



April 7th, 2008...the bolts are set around the parameter. Steel in put in place and the foundation is poured April 11th. This is always so exciting. The big trucks pumping out the concrete and so many people working so quickly to get it level. Knowing it would all be covered we didn't put in handprints, but we did make some stepping stones for the garden with Micah's hand and footprints.

April 1st, 2008...rough plumbing begins and passes inspection April 4th.






March 25, 2008 - Footings are dug, and forms for concrete are put in place. A string grid criss-crosses the entire foundation. Micah is picking out his bedroom area and as usual at this stage 1200 square feet doesn't look big enough for all that we have pictured there.






March 22nd, 2008...The dirt is flat, check written to neighbor for $200.00 collectible horse that fell from its lofty display and crashed to the floor during the recompaction of the soil. (Note to self: neighbor works nights and has been sleeping during the day) Day sleeper + construction zone = potential trouble! Micah loves the tractor and thanks to Jojo the tractor guy he gets a turn!



March 19th, 2008...After all the leg & paper work, the landscape of 2324 Alameda begins to change. Over-X they call it. Digging out and then recompacting the earth so that in case of the "Big One" (earthquake), or sudden flood, the land is stable and won't shift beneath the foundation. The soil engineer plus the back hoe work means $10,000 and we still have a flat backyard, minus the grass. But in the event of a major earthquake, head to the back house if you can get there!